CSIR-Central Mechanical Engineering Research Institute
Published on CSIR-Central Mechanical Engineering Research Institute (https://cmeri.res.in)

Printer-friendly > Completed Projects

Completed Projects

Projects

  • Application of Shape Memory Alloy in Medical Devices for Minimally Invasive Clinical solutions (OLP130612)

    Duration: 11 January 2010 to 31 October 2012

    PI: Dr. Srinivasan Aruchamy

    Total Cost: 5.101

  • Development of Novel Nano-Fluids as ultimate Industrial coolant and Lubricant (OLP190612)

    Duration: 10 January 2010 to 30 September 2012

    PI: Dr. RASHMI RANJAN SAHOO

    Total Cost: 25.00

    Sponsoring Agency: CSIR

  • Synthesis, Characterization and Biological Studies of New Family of Biomimetic Siderophores: Potentially Defending Agent Against Mycobacterial Infections Through Ion Sequestration (OLP181912)

    Duration: 8 January 2010 to 30 December 2013

    PI: Dr. Ujjwal Pal

    Total Cost: 28.80

  • Membraneless Micro Bio-Fuel Cell with Self Pumping Mechanism (OLP190312)

    Duration: 7 January 2010 to 30 June 2013

    PI: Dr. Ravi Kumar Arun

    Total Cost: 22.00

  • Studies on the Conversion of Ethanol from Lignocellulosic biomass (OLP200612)

    Duration: 7 January 2010 to 30 June 2013

    PI: Dr. Amit Ganguly

    Total Cost: 32.44

Pages

  • « first
  • <<
  • …
  • 98
  • 99
  • 100
  • …
  • >>
  • last »