The main objective is to examine the wake flow field of the cylinder by varying the FST by screens and Reynolds numbers. The near and far field wake characteristics are examined through fluctuating velocity measurements, turbulence statistics and sectional flow visualizations.
Duration: 11 October 2010 to 31 March 2014
Total Cost: 16.02
Sponsoring Agency: DST India
Development of low speed wind tunnel facility [.3 m X .3 m test section with the maximum velocity of 25 m/s] with less (<1%) turbulence intensity to study wide spectrum aerodynamic and heat transfer related problems. Facility creation for online DAQ systems with current state of art...
Duration: 11 October 2010 to 31 March 2014
Sponsoring Agency: CSIR
Main objectives :
i. Design of a hydraulic power pack and development of a manipulator having two linear actuators connected to a single member by appropriate joints and the controller.
ii. Integration of the components for development of an experimental setup for performance...
Duration: 21 September 2010 to 20 September 2012
Total Cost: 9.89
Sponsoring Agency: CSIR Empower Project
Main Objectives : To develop indigenous Al-alloy feedstock for manufacturing of aluminium alloy components by MIM process route.
What was achieved : Formulated Feedstock of Al-alloy, 2.Developed Sintered cylindrical samples of Al-alloy by MIM process route.
Duration: 21 September 2010 to 30 September 2012
PI: Mrs. Manju Singh
Co PI: Dr. Priyabrata Banerjee
Total Cost: 4.25
Sponsoring Agency: CSIR
Main objectives : Performance analysis of closed loop Non-Integer Order PID controller and Sliding mode for BLDC motor drive verified through MATLAB simulation and HIL (hardware in loop) testing.
What was achieved : Simulation and experimental analysis of Non integer order PID and SM...
Duration: 20 September 2010 to 19 September 2012
PI: Dr. Suman Saha
Total Cost: 0.11
Sponsoring Agency: CSIR-NIF Empower Project