-
Optimizing relevant machine parameters of rotavator under different operating and soil conditions.
Duration: 20 November 2009 to 31 December 2017
PI:
Mr. Ashwani Kumar Kushwaha
Total Cost: Rs. 151.10 Lakhs
Sponsoring Agency: DST and CSIR
-
To develop indigenous Irrigation Scheduler-Programmable System for the automation of both time and quantity based irrigation scheduling.
Duration: 20 November 2009 to 31 March 2014
PI:
Dr. Pradeep Rajan
Total Cost: Rs. 48.07 Lakhs
Sponsoring Agency: DST and CSIR
-
Design & development of a prototype of One-row Cotton picking head
Duration: 20 November 2009 to 31 December 2017
PI:
Mr. Ajay Yadav
Total Cost: Rs. 144.66 Lakhs
Sponsoring Agency: DST and CSIR
-
Duration: 14 September 2009 to 31 December 2013
PI:
Mr. Amit Jyoti Banerjee
Co PI:
Dr. Sudip Kumar Samanta
Total Cost: 79
Sponsoring Agency: DSP, Steel Authority of India Limited Durgapur Steel Plant, Durgapur
-
Duration: 12 September 2009 to 6 September 2012
PI:
Dr. Aditya Kr. Lohar
A.K. Shukla
Total Cost: 37.277
Sponsoring Agency: CESC, Ltd. Titagarh Generation Station, Titagarh