Duration: 4 September 2016 to 31 August 2017
The proposed project aims at developing suitable integrated waste management technology for handling 500 Kg per day municipal solid waste, at CSIR-CMERI. Plasma based waste-management technologies have been aimed to be applied for this project.
Duration: 1 September 2016 to 31 August 2017
PI: Dr. Amit Ganguly
Co PI: Dr. Priyabrata Banerjee
Total Cost: 80.00
Sponsoring Agency: CSIR
Thermal issues associated with the batteries are of great concern as cell temperature significantly affects the performance, life, and safety of batteries. Thermal behaviour is often characterized by an increase in performance and a decrease in life and safety as temperature increases beyond the...
Duration: 1 September 2016 to 31 August 2017
Co PI: Dr. Naresh Chandra Murmu Dr. Sivaprakash Sundaresan Dr. Santu Kumar Giri
Process optimization for production of briquettes from different agricultural wastes, selection of suitable binder, optimization of physical parameters of briquette, proximate analysis of produced briquettes, design and development of low-cost efficient briquetting machine, Design and...
Duration: 1 September 2016 to 30 June 2018
Co PI: Mr. Ashwani Kumar Kushwaha Dr. Pradeep Rajan
Total Cost: Rs.12.50 Lakhs
Sponsoring Agency: CSIR
Duration: 1 September 2016 to 31 December 2016