Main objectives :
i. Design of a hydraulic power pack and development of a manipulator having two linear actuators connected to a single member by appropriate joints and the controller.
ii. Integration of the components for development of an experimental setup for performance...
Duration: 21 September 2010 to 20 September 2012
Total Cost: 9.89
Sponsoring Agency: CSIR Empower Project
Main Objectives : To develop indigenous Al-alloy feedstock for manufacturing of aluminium alloy components by MIM process route.
What was achieved : Formulated Feedstock of Al-alloy, 2.Developed Sintered cylindrical samples of Al-alloy by MIM process route.
Duration: 21 September 2010 to 30 September 2012
PI: Mrs. Manju Singh
Co PI: Dr. Priyabrata Banerjee
Total Cost: 4.25
Sponsoring Agency: CSIR
Main objectives : Performance analysis of closed loop Non-Integer Order PID controller and Sliding mode for BLDC motor drive verified through MATLAB simulation and HIL (hardware in loop) testing.
What was achieved : Simulation and experimental analysis of Non integer order PID and SM...
Duration: 20 September 2010 to 19 September 2012
PI: Dr. Suman Saha
Total Cost: 0.11
Sponsoring Agency: CSIR-NIF Empower Project
Duration: 27 August 2010 to 7 January 2014
Total Cost: 18.15
Sponsoring Agency: DST, Government of India, Ministry of Science & Technology, Department of Science & Technology, Technology Bhavan, New Mehrauli Road, New Delhi - 110016
Duration: 25 August 2010 to 30 June 2012
PI: Dr. Soumen Sen
Co PI: Dr. Ranjit Ray Mr. Dibyendu Paul
Total Cost: 19.3