-
Duration: 28 May 2015 to 31 May 2017
PI:
Dr. Amit Ganguly
Co PI:
Dr. Pradip Kumar Chatterjee
Total Cost: 14.24
Sponsoring Agency: DST-UKIERI Department of Science & Technology (International Division)
-
Duration: 13 May 2015 to 31 May 2017
PI:
Mr. Rudra Prasad Chatterjee
Co PI:
Dr. Palash Kumar Maji
Total Cost: 5.00
Sponsoring Agency: Taldangra Panchayet Samity, Bankura
-
To find the blast wave profile and the mass flow generated inside the shock tube being installed in TBRL Chandigarh for pressure ratio varying from 3 to 30. Optimization of driver section length to obtain the Fried lander waveform using numerical simulation. The interaction of shock/blast wave...
Duration: 19 March 2015 to 18 November 2017
PI:
Dr. Murugan Thangadurai
Co PI:
Dr. Sudipta De
Total Cost: 16.02 Lakhs
Sponsoring Agency: DRDO ARMREB
-
Design and development of 1.5 m3/day capacity roof top biogas plant based on solid state fermentation using kitchen waste, optimization of production parameters, quality analysis of biogas and economic evaluation
Duration: 17 March 2015 to 31 December 2017
PI:
Dr. Krishnendu Kundu
Total Cost: Rs.20.18 Lakhs
Sponsoring Agency: PCRA, New Delhi
-
Duration: 8 January 2015 to 30 June 2016
PI:
Dr. Ranjit Ray
Co PI: Mr. D. Banerji
Total Cost: 41.00
Sponsoring Agency: IGCAR, Kalpakkam