Design and development of 1.5 m3/day capacity roof top biogas plant based on solid state fermentation using kitchen waste, optimization of production parameters, quality analysis of biogas and economic evaluation
Duration: 17 March 2015 to 31 December 2017
PI:
Dr. Krishnendu Kundu
Total Cost: Rs.20.18 Lakhs
Sponsoring Agency: PCRA, New Delhi
-
Duration: 8 January 2015 to 30 June 2016
PI:
Dr. Ranjit Ray
Co PI: Mr. D. Banerji
Total Cost: 41.00
Sponsoring Agency: IGCAR, Kalpakkam
-
Duration: 8 January 2015 to 30 September 2016
PI:
Dr. Ranjit Ray
Total Cost: 41 Lakhs
Sponsoring Agency: Indira Gandhi Centre of Atomic Research, Kalpakkam, Dept. of Atomic Energy, Govt. of India.
-
Contract Research to find out the suitability of graphene as hot forging lubricant.
Duration: 25 November 2014 to 25 November 2015
PI:
Dr. Naresh Chandra Murmu
Co PI:
Dr. Tapas Kuila
Total Cost: 15.02
Sponsoring Agency: Sona Koyo Steering Systems Ltd. Gurgaon
-
Main objectives: To explore a modified adsorption based defluoridation method suitable for Nalhati-Rampurhat area, Birbhum District, West Bengal, India
What was achieved: Modified adsorption based defluoridation method as a possible solution of drinking water problem in fluoride affected...
Duration: 20 November 2014 to 31 October 2015
PI:
Dr. Asit Kumar Batabyal
Co PI:
Dr. Bittagopal Mondal